NEW: Quickset Roofbolt TITAN 26/15
The efficient one-step stabilisation method for mines and tunnels

The STUVA Conference is a not-to-be-missed event for all national and international tunnelling experts. Ischebeck, too, will be there in Munich on 8–9 November 2023, presenting our proven tunnelling solutions. One new solution is the Quickset Roofbolt TITAN 26/15.

Better safety, better productivity
Fully automated installation

When it comes to mining and tunnelling operations, every fault in the rock costs valuable time and represents a risk to the teams underground. However, the Quickset Roofbolt TITAN 26/15 is a fast and effective way of stabilising faults. The bolt, including end plate, is installed in less than two minutes, fully automated in one operation: direct drilling and injection of a two-part resin, which fills not only the drilled hole, but also the surrounding fissures, voids and crevices in the rock. The resin cures after just one or two minutes, so the Quickset Roofbolt can accept loads immediately.

If you would like to find out more about the applications, advantages and fully automated installation of the Quickset Roofbolt TITAN 26/15, simply get in touch with us for an individual discussion of your needs.

Visit us on stand B 117 at the STUVA event.
Or simply give us a call on +49 (0)2333 8305-0.

Together, we can find a solution. We look forward to hearing from you.

Back to overview